Advanced multi-layer waterproofing engineered for long-lasting protection and durability, applied by our trained AWI applicator teams.
Over levelled and cured PCC, we apply one coat of bitumen primer all along the surface and let it dry for 2-3 hours until it becomes tack free. Once the primer dries, we apply 4mm SBS membrane along horizontal and vertical surfaces, keeping a constant 100mm overlap throughout the area, followed by a second membrane layer applied the same way.
Applied on the clean surface and allowed to dry completely.
Surface heated and membrane unrolled using torch for proper adhesion.
Coating applied on the external surface to protect against moisture & seepage.
Screed or protection board applied, followed by final inspection.